দ্যুৎ সঞ্চালন
The main operating function of PGCB is wheeling of energy from BPDB power stations and Generation Companies to Distribution entities utilizing transmission network. PGCB gets its energy wheeling charge from its clients(distribution entities) at the rate fixed by Bangladesh Electricity Regulatory Commission (BERC).
The PGCB took over about 1144 circuit km of 230 kV lines, 5255 circuit km of 132 kV lines, 6 nos of 230/132 kV substation and 63 nos of 132/33 kV substations from BPDB and DESA in different phases. Transmission lines of the company up to December, 2019 are stood at 861 ckt km of 400 kV lines, 3500 circuit km of 230 kV lines, 7614 circuit km of 132 kV lines and 1 nos of 400 kV Station, 3 nos of 400/230kV subtation, 2 nos of 400/132kV subtation, 21 nos of 230/132 kV substation and 110 nos of 132/33 kV substations.
The company has taken infrastructure development projects for further development of its operation.
Transmission Infrastructure Information
Tansmission Line as on: December, 2019
400kV 861 Circuit km
230kV 3,500 Circuit km
132kV 7,614 Circuit km
92.52 Circuit km (Others)
Substation as on: December, 2019
400kV 1 Nos. 2x500MW HVDC Back to Back station
400/230kV 3 Nos. 3120 MVA
1 Nos. 650 MVA (Others)
400/132 kV 2 Nos. 1,300 MVA
230/132kV 21 Nos. 11,475 MVA
6 Nos. 1910 MVA (Others)
132/33kV 110 Nos. 21,131MVA
31 Nos. 3,973 MVA (Others)
Dispatch Capacity at 33kV level 23,412 MW (Including all organizations)
Last Five years achievement
400kV Substation 1 Nos. 1x500MW HVDC Back to Back station
400/230kV 4 Nos. 3770 MVA
400/132 kV 2 Nos. 1300 MVA
230/132kV Substation 7 Nos: 4060 MVA
132/33kV Substation 32 Nos. 11191.5 MVA
400kV Transmission Line 696.61 Circuit km
230kV Transmission Line 453.24 Circuit km
132kV Transmission Line 1307.754 Circuit km